Client
InterContinenental Hotels Group (IHG)
Completion Date
2019
Building Specs
40,000 square feet
Engineer
Allen & Shariff
General Contractor
Mascaro Construction Company
project Summary:
On the 5th and 6th floor of the iconic Kaufmann’s building in downtown Pittsburgh, Even Hotel came to life. Not only do they support healthy living, but Even Hotel also supports sustainability, where Clista Electric really shines. Installing energy efficient lighting throughout the hotel was imperative to support their green initiative.
Clista provided a full electrical service distribution service. Also installed was new lighting and a lighting control system, fire alarm system, and branch power system for the main lobbies and hotel rooms.
Greatest Challenges:
- The project was located on the 5th and 6th floors of a building that was being renovated by another contractor. All larger material orders had to be hoisted thru an opening on the 5th floor.
- There were several floods on the Hotel floors due to the other construction.
- Several design changes made it difficult to maintain project timeline.